Solar plant: site data

Solar power plant in Krechiv, Volodymyrskyi Raion, Volyn Oblast

Krechiv: 1,090 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% above the oblast median (1,084). #134 of 215 in the rayon, #370 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 25 km away. 185 m above sea level. 25 km away: Volodymyr-Volynskyi, the nearest bigger centre, 1,100 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 87 km. 13.04 m between rows, pitch 16.81 m (latitude 50.7°).

Yield of 1 kWp
1,090kWh/year
Tilt
38°1° east of south
10 kW
10,904kWh/year
Row pitch
16.81m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Krechiv

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 87 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan50Feb90Mar119Apr131May135Jun135Jul132Aug109Sep83Oct40Nov31Dec

June: 135 kWh/kWp, December: 31 — 4.4 times less.

December: 31 against 28 in the oblast, 10.7% more.

Krechiv: plants, kWh
kWpA yearJuneDecember
55,452675155
1010,9041,350310
1516,3562,025465

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.