Solar plant: site data

Solar power plant in Hrushiv, Volodymyrskyi Raion, Volyn Oblast

Hrushiv: 1,095 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 0.9% above the oblast median (1,084). #94 of 215 in the rayon, #225 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 34 km away. 210 m above sea level. 25 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 1.4% more here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 64 km. 13.21 m between rows, pitch 16.93 m (latitude 50.6°).

Yield of 1 kWp
1,095kWh/year
Tilt
39°2° east of south
10 kW
10,945kWh/year
Row pitch
16.93m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Hrushiv

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 64 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb95Mar117Apr129May134Jun135Jul134Aug108Sep83Oct41Nov30Dec

July: 135 kWh/kWp, December: 30 — 4.5 times less.

November: 41 against 37 in the oblast, 10.8% more.

Hrushiv: plants, kWh
kWpA yearJulyDecember
55,473675150
1010,9451,350300
1516,4182,025450

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.