Solar plant: site data

Solar power plant in Suprunivka, Vinnytskyi Raion, Vinnytsia Oblast

Suprunivka: 1,142 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,143). #76 of 328 in the rayon, #629 of 1206 in the oblast.

Vinnytsya, the rayon centre, is 33 km away. 296 m above sea level. 33 km away: Vinnytsya, the nearest bigger centre, 1,127 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 33 km. 10.96 m between rows, pitch 14.83 m (latitude 49.0°).

Yield of 1 kWp
1,142kWh/year
Tilt
36°3° east of south
10 kW
11,416kWh/year
Row pitch
14.83m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Suprunivka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 33 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb90Mar121Apr139May142Jun144Jul142Aug116Sep87Oct41Nov31Dec

July: 144 kWh/kWp, December: 31 — 4.6 times less.

December: 31 against 32 in the oblast, 3.1% less.

Suprunivka: plants, kWh
kWpA yearJulyDecember
55,708720155
1011,4161,440310
1517,1242,160465

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vinnytskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.