Solar plant: site data

Solar power plant in Horodyshche, Vinnytskyi Raion, Vinnytsia Oblast

Horodyshche: 1,127 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.4% below the oblast median (1,143). #217 of 328 in the rayon, #892 of 1206 in the oblast.

Vinnytsya, the rayon centre, is 30 km away. 259 m above sea level. 24 km away: Khmilnyk, the nearest bigger centre, 1,116 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Вінниця, 31 km. 11.25 m between rows, pitch 15.12 m (latitude 49.4°).

Yield of 1 kWp
1,127kWh/year
Tilt
36°1° east of south
10 kW
11,267kWh/year
Row pitch
15.12m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Horodyshche

The designer opens with this place’s coordinates, latitude 49.4° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 31 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb91Mar120Apr138May140Jun142Jul140Aug114Sep85Oct39Nov30Dec

July: 142 kWh/kWp, December: 30 — 4.7 times less.

December: 30 against 32 in the oblast, 6.3% less.

Horodyshche: plants, kWh
kWpA yearJulyDecember
55,634710150
1011,2671,420300
1516,9012,130450

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Vinnytskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.