Solar plant: site data

Solar power plant in Vasylivske, Shostkynskyi Raion, Sumy Oblast

Vasylivske: 1,081 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 2.6% below the oblast median (1,110). #195 of 258 in the rayon, #1462 of 1534 in the oblast.

Shostka, the rayon centre, is 47 km away. 138 m above sea level. 34 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 174 km. 15.32 m between rows, pitch 19.04 m (latitude 52.3°).

Yield of 1 kWp
1,081kWh/year
Tilt
39°2° east of south
10 kW
10,805kWh/year
Row pitch
19.04m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Vasylivske

The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 174 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb98Mar114Apr138May140Jun137Jul133Aug104Sep68Oct31Nov24Dec

June: 140 kWh/kWp, December: 24 — 5.8 times less.

November: 31 against 35 in the oblast, 11.4% less.

Vasylivske: plants, kWh
kWpA yearJuneDecember
55,403700120
1010,8051,400240
1516,2082,100360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.