Solar plant: site data

Solar power plant in Ternivka, Konotopskyi Raion, Sumy Oblast

Ternivka: 1,100 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.9% below the oblast median (1,110). #277 of 318 in the rayon, #1219 of 1534 in the oblast.

Konotop, the rayon centre, is 28 km away. 151 m above sea level. 28 km away: Konotop, the nearest bigger centre, 1,110 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 90 km. 13.24 m between rows, pitch 17.06 m (latitude 51.1°).

Yield of 1 kWp
1,100kWh/year
Tilt
37°1° east of south
10 kW
10,997kWh/year
Row pitch
17.06m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Ternivka

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Суми, 90 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan57Feb87Mar114Apr140May143Jun143Jul141Aug109Sep75Oct34Nov22Dec

June: 143 kWh/kWp, December: 22 — 6.5 times less.

March: 87 against 95 in the oblast, 8.4% less.

Ternivka: plants, kWh
kWpA yearJuneDecember
55,499715110
1010,9971,430220
1516,4962,145330

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed