Solar plant: site data

Solar power plant in Sukhodil, Shostkynskyi Raion, Sumy Oblast

Sukhodil: 1,107 kWh per kWp a year, tilt 39° 1° east of south (PVGIS). Exactly the oblast median (1,110). #6 of 258 in the rayon, #896 of 1534 in the oblast.

Shostka, the rayon centre, is 55 km away. 178 m above sea level. 55 km away: Shostka, the nearest bigger centre, 1,082 — 2.3% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 104 km. 14.64 m between rows, pitch 18.36 m (latitude 51.8°).

Yield of 1 kWp
1,107kWh/year
Tilt
39°1° east of south
10 kW
11,067kWh/year
Row pitch
18.36m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sukhodil

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Суми, 104 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan61Feb100Mar115Apr140May143Jun140Jul136Aug106Sep71Oct34Nov23Dec

June: 143 kWh/kWp, December: 23 — 6.2 times less.

January: 39 against 36 in the oblast, 8.3% more.

Sukhodil: plants, kWh
kWpA yearJuneDecember
55,534715115
1011,0671,430230
1516,6012,145345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.