Solar plant: site data

Solar power plant in Stare Selo, Sumskyi Raion, Sumy Oblast

Stare Selo: 1,121 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.0% above the oblast median (1,110). #92 of 466 in the rayon, #351 of 1534 in the oblast.

Sumy, the rayon centre, is 10 km away. 131 m above sea level. 10 km away: Sumy, the nearest bigger centre, the same 1,117. Snow and wind from the nearest regional centre in the DBN — Суми, 9 km. 13.20 m between rows, pitch 16.97 m (latitude 50.8°).

Yield of 1 kWp
1,121kWh/year
Tilt
38°1° east of south
10 kW
11,213kWh/year
Row pitch
16.97m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Stare Selo

The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Суми, 9 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan63Feb95Mar116Apr139May142Jun143Jul141Aug109Sep76Oct37Nov23Dec

July: 143 kWh/kWp, December: 23 — 6.2 times less.

January: 39 against 36 in the oblast, 8.3% more.

Stare Selo: plants, kWh
kWpA yearJulyDecember
55,607715115
1011,2131,430230
1516,8202,145345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Sumskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.