Solar plant: site data

Solar power plant in Prudyshche, Shostkynskyi Raion, Sumy Oblast

Prudyshche: 1,076 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 3.1% below the oblast median (1,110). #225 of 258 in the rayon, #1498 of 1534 in the oblast.

Shostka, the rayon centre, is 20 km away. 160 m above sea level. 20 km away: Shostka, the nearest bigger centre, 1,082 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 137 km. 14.86 m between rows, pitch 18.58 m (latitude 52.0°).

Yield of 1 kWp
1,076kWh/year
Tilt
39°3° east of south
10 kW
10,756kWh/year
Row pitch
18.58m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Prudyshche

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Суми, 137 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb95Mar113Apr137May138Jun137Jul133Aug104Sep69Oct32Nov24Dec

June: 138 kWh/kWp, December: 24 — 5.8 times less.

November: 32 against 35 in the oblast, 8.6% less.

Prudyshche: plants, kWh
kWpA yearJuneDecember
55,378690120
1010,7561,380240
1516,1342,070360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.