Solar plant: site data
Solar power plant in Vyshneve, Sevastopol City
Vyshneve: 1,379 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 3.4% above the oblast median (1,333). #6 of 42 in the oblast.
15 m above sea level. 15 km away: Sevastopol, the nearest bigger centre, the same 1,372. Snow and wind from the nearest regional centre in the DBN — Херсон, 225 km. 8.33 m between rows, pitch 12.20 m (latitude 44.7°).
- Yield of 1 kWp
- 1,379kWh/year
- Tilt
- 36°3° west of south
- 10 kW
- 13,789kWh/year
- Row pitch
- 12.20m · GCR 0.39
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Vyshneve
The designer opens with this place’s coordinates, latitude 44.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 225 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 163 kWh/kWp, December: 52 — 3.1 times less.
January: 56 against 53 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,895 | 815 | 260 |
| 10 | 13,789 | 1,630 | 520 |
| 15 | 20,684 | 2,445 | 780 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.