Solar plant: site data

Solar power plant in Sliuzivka, Kremenchutskyi Raion, Poltava Oblast

Sliuzivka: 1,154 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.1% above the oblast median (1,142). #228 of 329 in the rayon, #394 of 1856 in the oblast.

Kremenchuk, the rayon centre, is 63 km away. 93 m above sea level. 50 km away: Lubny, the nearest bigger centre, 1,146 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 70 km. 11.69 m between rows, pitch 15.51 m (latitude 49.6°).

Yield of 1 kWp
1,154kWh/year
Tilt
37°2° east of south
10 kW
11,544kWh/year
Row pitch
15.51m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sliuzivka

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 70 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan55Feb93Mar121Apr142May145Jun149Jul147Aug119Sep86Oct39Nov27Dec

July: 149 kWh/kWp, December: 27 — 5.5 times less.

January: 32 against 35 in the oblast, 8.6% less.

Sliuzivka: plants, kWh
kWpA yearJulyDecember
55,772745135
1011,5441,490270
1517,3162,235405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kremenchutskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.