Solar plant: site data

Solar power plant in Uhersko, Stryiskyi Raion, Lviv Oblast

Uhersko: 1,089 kWh per kWp a year, tilt 38° facing south (PVGIS). 0.5% above the oblast median (1,084). #143 of 286 in the rayon, #535 of 1532 in the oblast.

Stryi, the rayon centre, is 6 km away. 283 m above sea level. 6 km away: Stryi, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Львів, 61 km. 11.73 m between rows, pitch 15.50 m (latitude 49.3°).

Yield of 1 kWp
1,089kWh/year
Tilt
38°facing south
10 kW
10,893kWh/year
Row pitch
15.50m · GCR 0.31
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Uhersko

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Львів, 61 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan57Feb93Mar113Apr123May124Jun131Jul129Aug107Sep85Oct47Nov35Dec

July: 131 kWh/kWp, December: 35 — 3.7 times less.

January: 44 against 39 in the oblast, 12.8% more.

Uhersko: plants, kWh
kWpA yearJulyDecember
55,447655175
1010,8931,310350
1516,3401,965525

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Stryiskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.