Solar plant: site data

Solar power plant in Synkovychi, Lvivskyi Raion, Lviv Oblast

Synkovychi: 1,098 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.3% above the oblast median (1,084). #54 of 356 in the rayon, #125 of 1532 in the oblast.

Lviv, the rayon centre, is 50 km away. 224 m above sea level. 41 km away: Sheptytskyi, the nearest bigger centre, 1,079 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Львів, 51 km. 12.60 m between rows, pitch 16.37 m (latitude 50.2°).

Yield of 1 kWp
1,098kWh/year
Tilt
38°2° east of south
10 kW
10,979kWh/year
Row pitch
16.37m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,310 / 520Pa

Ground frame designer

A ground frame for a solar plant: Synkovychi

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Львів, 51 km: snow 1,310 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan55Feb97Mar116Apr126May129Jun134Jul132Aug108Sep85Oct45Nov32Dec

July: 134 kWh/kWp, December: 32 — 4.2 times less.

January: 37 against 39 in the oblast, 5.1% less.

Synkovychi: plants, kWh
kWpA yearJulyDecember
55,490670160
1010,9791,340320
1516,4692,010480

Snow and wind: Львів

Example: a 10 kW ground frame

For the loads of Lviv: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lvivskyi RaionLviv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.