Solar plant: site data

Solar power plant in Kozatske, Oleksandriiskyi Raion, Kirovohrad Oblast

Kozatske: 1,176 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.6% above the oblast median (1,157). #15 of 191 in the rayon, #34 of 708 in the oblast.

Oleksandriya, the rayon centre, is 45 km away. 138 m above sea level. 15 km away: Petrove, the nearest bigger centre, 1,169 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Кропивницький, 91 km. 10.45 m between rows, pitch 14.32 m (latitude 48.3°).

Yield of 1 kWp
1,176kWh/year
Tilt
36°3° east of south
10 kW
11,762kWh/year
Row pitch
14.32m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,230 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kozatske

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Кропивницький, 91 km: snow 1,230 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb95Mar119Apr139May145Jun151Jul149Aug123Sep91Oct44Nov28Dec

July: 151 kWh/kWp, December: 28 — 5.4 times less.

February: 56 against 52 in the oblast, 7.7% more.

Kozatske: plants, kWh
kWpA yearJulyDecember
55,881755140
1011,7621,510280
1517,6432,265420

Snow and wind: Кропивницький

Example: a 10 kW ground frame

For the loads of Kropyvnytskyi: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 49,026 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Oleksandriiskyi RaionKirovohrad Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.