Solar plant: site data
Solar power plant in Runkoshiv, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast
Runkoshiv: 1,146 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 4.2% above the oblast median (1,100). #21 of 226 in the rayon, #21 of 1109 in the oblast.
Kamyanets-Podilskyi, the rayon centre, is 31 km away. 260 m above sea level. 25 km away: Kelmentsi, the nearest bigger centre, the same 1,148. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 85 km. 10.69 m between rows, pitch 14.56 m (latitude 48.7°).
- Yield of 1 kWp
- 1,146kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 11,459kWh/year
- Row pitch
- 14.56m · GCR 0.33
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Runkoshiv
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 85 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 34 — 4.2 times less.
January: 38 against 32 in the oblast, 18.8% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,730 | 710 | 170 |
| 10 | 11,459 | 1,420 | 340 |
| 15 | 17,189 | 2,130 | 510 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Hrushka3 km1,150 kWh/kWp
- Chabanivka4 km1,147 kWh/kWp
- Huta-Chuhorska5 km1,145 kWh/kWp
- Krushanivka6 km1,147 kWh/kWp
- Podilske6 km1,147 kWh/kWp
- Hubariv7 km1,147 kWh/kWp
All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.