Solar plant: site data

Solar power plant in Putryntsi, Shepetivskyi Raion, Khmelnytskyi Oblast

Putryntsi: 1,083 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.6% below the oblast median (1,100). #252 of 307 in the rayon, #981 of 1109 in the oblast.

Shepetivka, the rayon centre, is 18 km away. 244 m above sea level. 4 km away: Iziaslav, the nearest bigger centre, 1,092 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 66 km. 12.23 m between rows, pitch 16.05 m (latitude 50.2°).

Yield of 1 kWp
1,083kWh/year
Tilt
37°2° east of south
10 kW
10,830kWh/year
Row pitch
16.05m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Putryntsi

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 66 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan52Feb89Mar117Apr131May134Jun137Jul136Aug110Sep82Oct36Nov28Dec

July: 137 kWh/kWp, December: 28 — 4.9 times less.

December: 28 against 29 in the oblast, 3.4% less.

Putryntsi: plants, kWh
kWpA yearJulyDecember
55,415685140
1010,8301,370280
1516,2452,055420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.