Solar plant: site data
Solar power plant in Adamiv, Shepetivskyi Raion, Khmelnytskyi Oblast
Adamiv: 1,107 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% above the oblast median (1,100). #29 of 307 in the rayon, #415 of 1109 in the oblast.
Shepetivka, the rayon centre, is 27 km away. 268 m above sea level. 8 km away: Polonne, the nearest bigger centre, the same 1,103. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 79 km. 12.16 m between rows, pitch 15.98 m (latitude 50.1°).
- Yield of 1 kWp
- 1,107kWh/year
- Tilt
- 37°1° east of south
- 10 kW
- 11,069kWh/year
- Row pitch
- 15.98m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,340 / 500Pa
Ground frame designer
A ground frame for a solar plant: Adamiv
The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 79 km: snow 1,340 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 141 kWh/kWp, December: 29 — 4.9 times less.
February: 53 against 51 in the oblast, 3.9% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,535 | 705 | 145 |
| 10 | 11,069 | 1,410 | 290 |
| 15 | 16,604 | 2,115 | 435 |
Example: a 10 kW ground frame
For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Rohovychi3 km1,104 kWh/kWp
- Hannusyne4 km1,105 kWh/kWp
- Siahriv4 km1,106 kWh/kWp
- Velyka Berezna4 km1,103 kWh/kWp
- Kokhanivka5 km1,107 kWh/kWp
- Andriivka5 km1,107 kWh/kWp
All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.