Solar power plant in Nove Pekelne, Berestynskyi Raion, Kharkiv Oblast

Nove Pekelne: 1,158 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.3% above the oblast median (1,142). #20 of 208 in the rayon, #64 of 1769 in the oblast.

Berestyn, the rayon centre, is 38 km away. 92 m above sea level. 38 km away: Berestyn, the nearest bigger centre, the same 1,158. Snow and wind from the nearest regional centre in the DBN — Дніпро, 69 km. 10.98 m between rows, pitch 14.85 m (latitude 49.0°).

Yield of 1 kWp
1,158kWh/year
Tilt
36°2° east of south
10 kW
11,575kWh/year
Row pitch
14.85m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Nove Pekelne

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 69 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb92Mar116Apr139May144Jun150Jul149Aug121Sep88Oct43Nov27Dec

July: 150 kWh/kWp, December: 27 — 5.6 times less.

December: 27 against 24 in the oblast, 12.5% more.

Nove Pekelne: plants, kWh
kWpA yearJulyDecember
55,788750135
1011,5751,500270
1517,3632,250405

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.