Solar plant: site data

Solar power plant in Karabushchyne, Berestynskyi Raion, Kharkiv Oblast

Karabushchyne: 1,145 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,142). #189 of 208 in the rayon, #720 of 1769 in the oblast.

Berestyn, the rayon centre, is 28 km away. 151 m above sea level. 28 km away: Berestyn, the nearest bigger centre, 1,158 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 95 km. 11.11 m between rows, pitch 14.98 m (latitude 49.2°).

Yield of 1 kWp
1,145kWh/year
Tilt
36°2° east of south
10 kW
11,449kWh/year
Row pitch
14.98m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Karabushchyne

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 95 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan53Feb91Mar114Apr137May143Jun150Jul149Aug120Sep86Oct41Nov25Dec

July: 150 kWh/kWp, December: 25 — 6.0 times less.

January: 36 against 39 in the oblast, 7.7% less.

Karabushchyne: plants, kWh
kWpA yearJulyDecember
55,725750125
1011,4491,500250
1517,1742,250375

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.