Solar plant: site data

Solar power plant in Yurivske, Pavlohradskyi Raion, Dnipropetrovsk Oblast

Yurivske: 1,160 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.5% below the oblast median (1,177). #73 of 89 in the rayon, #1412 of 1501 in the oblast.

Pavlohrad, the rayon centre, is 22 km away. 109 m above sea level. 22 km away: Pavlohrad, the nearest bigger centre, 1,172 — 1.0% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 77 km. 10.72 m between rows, pitch 14.59 m (latitude 48.7°).

Yield of 1 kWp
1,160kWh/year
Tilt
36°1° east of south
10 kW
11,597kWh/year
Row pitch
14.59m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Yurivske

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 77 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb93Mar116Apr139May143Jun150Jul150Aug122Sep89Oct44Nov27Dec

July: 150 kWh/kWp, December: 27 — 5.6 times less.

November: 44 against 47 in the oblast, 6.4% less.

Yurivske: plants, kWh
kWpA yearJulyDecember
55,799750135
1011,5971,500270
1517,3962,250405

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pavlohradskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.