Solar plant: site data

Solar power plant in Trudoliubivka, Samarivskyi Raion, Dnipropetrovsk Oblast

Trudoliubivka: 1,156 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.8% below the oblast median (1,177). #91 of 115 in the rayon, #1457 of 1501 in the oblast.

Samar, the rayon centre, is 39 km away. 127 m above sea level. 39 km away: Samar, the nearest bigger centre, 1,189 — 2.8% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 60 km. 10.94 m between rows, pitch 14.81 m (latitude 49.0°).

Yield of 1 kWp
1,156kWh/year
Tilt
36°2° east of south
10 kW
11,562kWh/year
Row pitch
14.81m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Trudoliubivka

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 60 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb92Mar116Apr139May143Jun150Jul149Aug120Sep88Oct43Nov26Dec

July: 150 kWh/kWp, December: 26 — 5.8 times less.

November: 43 against 47 in the oblast, 8.5% less.

Trudoliubivka: plants, kWh
kWpA yearJulyDecember
55,781750130
1011,5621,500260
1517,3432,250390

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Samarivskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.