Solar plant: site data

Solar power plant in Tokivske, Kryvorizkyi Raion, Dnipropetrovsk Oblast

Tokivske: 1,223 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 3.9% above the oblast median (1,177). #4 of 272 in the rayon, #41 of 1501 in the oblast.

Kryvyy Rih, the rayon centre, is 51 km away. 61 m above sea level. 33 km away: Nikopol, the nearest bigger centre, the same 1,224. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 90 km. 9.98 m between rows, pitch 13.85 m (latitude 47.7°).

Yield of 1 kWp
1,223kWh/year
Tilt
36°2° east of south
10 kW
12,234kWh/year
Row pitch
13.85m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Tokivske

The designer opens with this place’s coordinates, latitude 47.7° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 90 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan58Feb101Mar124Apr143May146Jun154Jul153Aug127Sep95Oct50Nov32Dec

July: 154 kWh/kWp, December: 32 — 4.8 times less.

January: 40 against 35 in the oblast, 14.3% more.

Tokivske: plants, kWh
kWpA yearJulyDecember
56,117770160
1012,2341,540320
1518,3512,310480

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 50,687 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kryvorizkyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.