Solar power plant in Ternivka, Pavlohradskyi Raion, Dnipropetrovsk Oblast

Ternivka: 1,169 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.7% below the oblast median (1,177). #33 of 89 in the rayon, #1175 of 1501 in the oblast.

Pavlohrad, the rayon centre, is 15 km away. 111 m above sea level. 15 km away: Pavlohrad, the nearest bigger centre, the same 1,172. Snow and wind from the nearest regional centre in the DBN — Дніпро, 76 km. 10.59 m between rows, pitch 14.46 m (latitude 48.5°).

Yield of 1 kWp
1,169kWh/year
Tilt
36°1° east of south
10 kW
11,693kWh/year
Row pitch
14.46m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Ternivka

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 76 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb94Mar117Apr139May143Jun148Jul150Aug122Sep90Oct46Nov29Dec

August: 150 kWh/kWp, December: 29 — 5.2 times less.

December: 29 against 28 in the oblast, 3.6% more.

Ternivka: plants, kWh
kWpA yearAugustDecember
55,847750145
1011,6931,500290
1517,5402,250435

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Pavlohradskyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.