Solar plant: site data

Solar power plant in Spokiy, Kryvorizkyi Raion, Dnipropetrovsk Oblast

Spokiy: 1,175 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,177). #238 of 272 in the rayon, #893 of 1501 in the oblast.

Kryvyy Rih, the rayon centre, is 39 km away. 164 m above sea level. 39 km away: Kryvyy Rih, the nearest bigger centre, 1,190 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 99 km. 10.28 m between rows, pitch 14.15 m (latitude 48.1°).

Yield of 1 kWp
1,175kWh/year
Tilt
36°3° east of south
10 kW
11,749kWh/year
Row pitch
14.15m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Spokiy

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 99 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb93Mar119Apr138May145Jun153Jul151Aug124Sep91Oct46Nov29Dec

July: 153 kWh/kWp, December: 29 — 5.3 times less.

February: 52 against 54 in the oblast, 3.7% less.

Spokiy: plants, kWh
kWpA yearJulyDecember
55,875765145
1011,7491,530290
1517,6242,295435

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kryvorizkyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.