Solar plant: site data

Solar power plant in Petrove, Kryvorizkyi Raion, Dnipropetrovsk Oblast

Petrove: 1,175 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,177). #240 of 272 in the rayon, #904 of 1501 in the oblast.

Kryvyy Rih, the rayon centre, is 42 km away. 100 m above sea level. 42 km away: Kryvyy Rih, the nearest bigger centre, 1,190 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 92 km. 10.23 m between rows, pitch 14.10 m (latitude 48.0°).

Yield of 1 kWp
1,175kWh/year
Tilt
36°3° east of south
10 kW
11,747kWh/year
Row pitch
14.10m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Petrove

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 92 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan50Feb93Mar119Apr138May144Jun154Jul151Aug124Sep92Oct47Nov28Dec

July: 154 kWh/kWp, December: 28 — 5.5 times less.

February: 50 against 54 in the oblast, 7.4% less.

Petrove: plants, kWh
kWpA yearJulyDecember
55,874770140
1011,7471,540280
1517,6212,310420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 50,687 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kryvorizkyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.