Solar power plant in Krynychky, Kryvorizkyi Raion, Dnipropetrovsk Oblast

Krynychky: 1,169 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.7% below the oblast median (1,177). #269 of 272 in the rayon, #1187 of 1501 in the oblast.

Kryvyy Rih, the rayon centre, is 37 km away. 74 m above sea level. 37 km away: Kryvyy Rih, the nearest bigger centre, 1,190 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 105 km. 10.32 m between rows, pitch 14.19 m (latitude 48.2°).

Yield of 1 kWp
1,169kWh/year
Tilt
36°3° east of south
10 kW
11,690kWh/year
Row pitch
14.19m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Krynychky

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 105 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb92Mar118Apr138May144Jun152Jul150Aug124Sep91Oct45Nov27Dec

July: 152 kWh/kWp, December: 27 — 5.6 times less.

November: 45 against 47 in the oblast, 4.3% less.

Krynychky: plants, kWh
kWpA yearJulyDecember
55,845760135
1011,6901,520270
1517,5352,280405

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kryvorizkyi RaionDnipropetrovsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.