Solar plant: site data

Solar power plant in Novoselytsya, Chernivetskyi Raion, Chernivtsi Oblast

Novoselytsya: 1,158 kWh per kWp a year, tilt 37° facing south (PVGIS). 1.4% above the oblast median (1,143). #58 of 215 in the rayon, #72 of 422 in the oblast.

Chernivtsi, the rayon centre, is 26 km away. 139 m above sea level. 26 km away: Chernivtsi, the nearest bigger centre, 1,151 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 26 km. 10.61 m between rows, pitch 14.43 m (latitude 48.2°).

Yield of 1 kWp
1,158kWh/year
Tilt
37°facing south
10 kW
11,581kWh/year
Row pitch
14.43m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Novoselytsya

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 26 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan61Feb99Mar120Apr133May131Jun142Jul139Aug116Sep88Oct47Nov36Dec

July: 142 kWh/kWp, December: 36 — 3.9 times less.

December: 36 against 37 in the oblast, 2.7% less.

Novoselytsya: plants, kWh
kWpA yearJulyDecember
55,791710180
1011,5811,420360
1517,3722,130540

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.