Solar plant: site data

Solar power plant in Kut, Chernivetskyi Raion, Chernivtsi Oblast

Kut: 1,158 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.3% above the oblast median (1,143). #63 of 215 in the rayon, #84 of 422 in the oblast.

Chernivtsi, the rayon centre, is 13 km away. 258 m above sea level. 13 km away: Chernivtsi, the nearest bigger centre, 1,151 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 12 km. 10.60 m between rows, pitch 14.42 m (latitude 48.2°).

Yield of 1 kWp
1,158kWh/year
Tilt
37°1° east of south
10 kW
11,576kWh/year
Row pitch
14.42m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Kut

The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 12 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan62Feb99Mar119Apr132May130Jun141Jul138Aug116Sep89Oct48Nov38Dec

July: 141 kWh/kWp, December: 38 — 3.7 times less.

February: 62 against 60 in the oblast, 3.3% more.

Kut: plants, kWh
kWpA yearJulyDecember
55,788705190
1011,5761,410380
1517,3642,115570

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.