Solar plant: site data
Solar power plant in Burdey, Chernivetskyi Raion, Chernivtsi Oblast
Burdey: 1,127 kWh per kWp a year, tilt 37° 5° west of south (PVGIS). 1.3% below the oblast median (1,143). #185 of 215 in the rayon, #316 of 422 in the oblast.
Chernivtsi, the rayon centre, is 14 km away. 179 m above sea level. 11 km away: Kitsman, the nearest bigger centre, 1,137 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Чернівці, 15 km. 10.70 m between rows, pitch 14.52 m (latitude 48.3°).
- Yield of 1 kWp
- 1,127kWh/year
- Tilt
- 37°5° west of south
- 10 kW
- 11,274kWh/year
- Row pitch
- 14.52m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Burdey
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 15 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 138 kWh/kWp, December: 38 — 3.6 times less.
February: 58 against 60 in the oblast, 3.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,637 | 690 | 190 |
| 10 | 11,274 | 1,380 | 380 |
| 15 | 16,911 | 2,070 | 570 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Korostuvata2 km1,127 kWh/kWp
- Luzhany2 km1,142 kWh/kWp
- Revne3 km1,138 kWh/kWp
- Dubivtsi4 km1,141 kWh/kWp
- Shypyntsi4 km1,143 kWh/kWp
- Hlynytsya4 km1,096 kWh/kWp
All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.