Bila: 1,150 kWh per kWp a year, tilt 38° 1° west of south (PVGIS). 0.6% above the oblast median (1,143). #111 of 215 in the rayon, #159 of 422 in the oblast.

Chernivtsi, the rayon centre, is 5 km away. 171 m above sea level. 5 km away: Chernivtsi, the nearest bigger centre, the same 1,151. Snow and wind from the nearest regional centre in the DBN — Чернівці, 5 km. 10.93 m between rows, pitch 14.70 m (latitude 48.3°).

Yield of 1 kWp
1,150kWh/year
Tilt
38°1° west of south
10 kW
11,496kWh/year
Row pitch
14.70m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Bila

The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 5 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan61Feb97Mar118Apr131May129Jun139Jul137Aug114Sep89Oct47Nov39Dec

July: 139 kWh/kWp, December: 39 — 3.6 times less.

January: 48 against 45 in the oblast, 6.7% more.

Bila: plants, kWh
kWpA yearJulyDecember
55,748695195
1011,4961,390390
1517,2442,085585

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernivetskyi RaionChernivtsi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.