Yaklychi: 1,106 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #57 of 220 in the rayon, #848 of 1558 in the oblast.

Koryukivka, the rayon centre, is 35 km away. 120 m above sea level. 35 km away: Koryukivka, the nearest bigger centre, 1,085 — 2.0% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 90 km. 14.02 m between rows, pitch 17.79 m (latitude 51.5°).

Yield of 1 kWp
1,106kWh/year
Tilt
38°1° east of south
10 kW
11,063kWh/year
Row pitch
17.79m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Yaklychi

The designer opens with this place’s coordinates, latitude 51.5° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 90 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan59Feb98Mar116Apr140May142Jun140Jul137Aug109Sep73Oct33Nov25Dec

June: 142 kWh/kWp, December: 25 — 5.7 times less.

December: 25 against 24 in the oblast, 4.2% more.

Yaklychi: plants, kWh
kWpA yearJuneDecember
55,532710125
1011,0631,420250
1516,5952,130375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Koriukivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.