Solar plant: site data

Solar power plant in Troitske, Novhorod-Siverskyi Raion, Chernihiv Oblast

Troitske: 1,096 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.0% below the oblast median (1,108). #55 of 247 in the rayon, #1075 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 11 km away. 194 m above sea level. 11 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 136 km. 14.90 m between rows, pitch 18.62 m (latitude 52.0°).

Yield of 1 kWp
1,096kWh/year
Tilt
39°2° east of south
10 kW
10,964kWh/year
Row pitch
18.62m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Troitske

The designer opens with this place’s coordinates, latitude 52.0° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 136 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan61Feb98Mar115Apr138May141Jun138Jul135Aug106Sep71Oct31Nov24Dec

June: 141 kWh/kWp, December: 24 — 5.9 times less.

January: 38 against 35 in the oblast, 8.6% more.

Troitske: plants, kWh
kWpA yearJuneDecember
55,482705120
1010,9641,410240
1516,4462,115360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.