Solar plant: site data

Solar power plant in Stanove, Novhorod-Siverskyi Raion, Chernihiv Oblast

Stanove: 1,109 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,108). #10 of 247 in the rayon, #720 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 60 km away. 127 m above sea level. 44 km away: Koryukivka, the nearest bigger centre, 1,085 — 2.3% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 103 km. 14.04 m between rows, pitch 17.81 m (latitude 51.6°).

Yield of 1 kWp
1,109kWh/year
Tilt
38°1° east of south
10 kW
11,092kWh/year
Row pitch
17.81m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Stanove

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 103 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb96Mar117Apr141May143Jun142Jul138Aug109Sep74Oct33Nov24Dec

June: 143 kWh/kWp, December: 24 — 6.0 times less.

January: 34 against 35 in the oblast, 2.9% less.

Stanove: plants, kWh
kWpA yearJuneDecember
55,546715120
1011,0921,430240
1516,6382,145360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.