Solar power plant in Sheptaky, Novhorod-Siverskyi Raion, Chernihiv Oblast
Sheptaky: 1,085 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 2.0% below the oblast median (1,108). #146 of 247 in the rayon, #1297 of 1558 in the oblast.
Novhorod-Siverskyi, the rayon centre, is 12 km away. 151 m above sea level. 12 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 141 km. 15.02 m between rows, pitch 18.74 m (latitude 52.1°).
- Yield of 1 kWp
- 1,085kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 10,853kWh/year
- Row pitch
- 18.74m · GCR 0.26
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Sheptaky
The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 141 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 139 kWh/kWp, December: 25 — 5.6 times less.
October: 70 against 75 in the oblast, 6.7% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,427 | 695 | 125 |
| 10 | 10,853 | 1,390 | 250 |
| 15 | 16,280 | 2,085 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.
How these numbers are computed
Nearby
- Forsove5 km1,085 kWh/kWp
- Krolevets-Slobidka6 km1,084 kWh/kWp
- Forostovychi6 km1,089 kWh/kWp
- Uzrui6 km1,074 kWh/kWp
- Klevyn7 km1,074 kWh/kWp
- Kuzmynske7 km1,082 kWh/kWp
All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.