Solar plant: site data

Solar power plant in Shchurivka, Prylutskyi Raion, Chernihiv Oblast

Shchurivka: 1,122 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.3% above the oblast median (1,108). #82 of 285 in the rayon, #189 of 1558 in the oblast.

Pryluky, the rayon centre, is 21 km away. 129 m above sea level. 21 km away: Pryluky, the nearest bigger centre, 1,116 — 0.5% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 123 km. 13.11 m between rows, pitch 16.88 m (latitude 50.7°).

Yield of 1 kWp
1,122kWh/year
Tilt
38°2° east of south
10 kW
11,221kWh/year
Row pitch
16.88m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Shchurivka

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 123 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb93Mar117Apr140May143Jun145Jul141Aug111Sep79Oct35Nov25Dec

July: 145 kWh/kWp, December: 25 — 5.8 times less.

November: 35 against 33 in the oblast, 6.1% more.

Shchurivka: plants, kWh
kWpA yearJulyDecember
55,611725125
1011,2211,450250
1516,8322,175375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.