Solar plant: site data
Solar power plant in Rubannykiv, Novhorod-Siverskyi Raion, Chernihiv Oblast
Rubannykiv: 1,114 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 0.5% above the oblast median (1,108). #3 of 247 in the rayon, #527 of 1558 in the oblast.
Novhorod-Siverskyi, the rayon centre, is 71 km away. 128 m above sea level. 25 km away: Konotop, the nearest bigger centre, the same 1,110. Snow and wind from the nearest regional centre in the DBN — Чернігів, 116 km. 13.85 m between rows, pitch 17.62 m (latitude 51.4°).
- Yield of 1 kWp
- 1,114kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,138kWh/year
- Row pitch
- 17.62m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Rubannykiv
The designer opens with this place’s coordinates, latitude 51.4° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 116 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 143 kWh/kWp, December: 24 — 6.0 times less.
February: 60 against 57 in the oblast, 5.3% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,569 | 715 | 120 |
| 10 | 11,138 | 1,430 | 240 |
| 15 | 16,707 | 2,145 | 360 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.
How these numbers are computed
Nearby
- Veselivka1 km1,105 kWh/kWp
- Lopatyn1 km1,103 kWh/kWp
- Bondari2 km1,106 kWh/kWp
- Pusta Hreblia2 km1,106 kWh/kWp
- Lubenets2 km1,108 kWh/kWp
- Lisova Poliana2 km1,102 kWh/kWp
All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.