Solar plant: site data

Solar power plant in Novenke, Novhorod-Siverskyi Raion, Chernihiv Oblast

Novenke: 1,087 kWh per kWp a year, tilt 39° 3° east of south (PVGIS). 1.9% below the oblast median (1,108). #135 of 247 in the rayon, #1258 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 21 km away. 195 m above sea level. 21 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 149 km. 15.18 m between rows, pitch 18.90 m (latitude 52.2°).

Yield of 1 kWp
1,087kWh/year
Tilt
39°3° east of south
10 kW
10,871kWh/year
Row pitch
18.90m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Novenke

The designer opens with this place’s coordinates, latitude 52.2° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 149 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan61Feb97Mar114Apr138May139Jun137Jul133Aug105Sep70Oct31Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

February: 61 against 57 in the oblast, 7.0% more.

Novenke: plants, kWh
kWpA yearJuneDecember
55,436695120
1010,8711,390240
1516,3062,085360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.