Solar plant: site data
Solar power plant in Lutava, Chernihivskyi Raion, Chernihiv Oblast
Lutava: 1,120 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.1% above the oblast median (1,108). #83 of 479 in the rayon, #285 of 1558 in the oblast.
Chernihiv, the rayon centre, is 69 km away. 102 m above sea level. 48 km away: Vyshhorod, the nearest bigger centre, 1,112 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 60 km. 13.35 m between rows, pitch 17.12 m (latitude 51.0°).
- Yield of 1 kWp
- 1,120kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,197kWh/year
- Row pitch
- 17.12m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,550 / 370Pa
Ground frame designer
A ground frame for a solar plant: Lutava
The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Київ, 60 km: snow 1,550 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 142 kWh/kWp, December: 27 — 5.3 times less.
December: 27 against 24 in the oblast, 12.5% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,599 | 710 | 135 |
| 10 | 11,197 | 1,420 | 270 |
| 15 | 16,796 | 2,130 | 405 |
Example: a 10 kW ground frame
For the loads of Kyiv: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 49,237 UAH.
How these numbers are computed
Nearby
- Vypovziv3 km1,120 kWh/kWp
- Karpylivka3 km1,121 kWh/kWp
- Desna5 km1,120 kWh/kWp
- Oster5 km1,121 kWh/kWp
- Poliske7 km1,125 kWh/kWp
- Koropie8 km1,119 kWh/kWp
All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.