Solar plant: site data

Solar power plant in Lutava, Chernihivskyi Raion, Chernihiv Oblast

Lutava: 1,120 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.1% above the oblast median (1,108). #83 of 479 in the rayon, #285 of 1558 in the oblast.

Chernihiv, the rayon centre, is 69 km away. 102 m above sea level. 48 km away: Vyshhorod, the nearest bigger centre, 1,112 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Київ, 60 km. 13.35 m between rows, pitch 17.12 m (latitude 51.0°).

Yield of 1 kWp
1,120kWh/year
Tilt
38°2° east of south
10 kW
11,197kWh/year
Row pitch
17.12m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Lutava

The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Київ, 60 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan59Feb97Mar118Apr137May142Jun141Jul137Aug113Sep79Oct34Nov27Dec

June: 142 kWh/kWp, December: 27 — 5.3 times less.

December: 27 against 24 in the oblast, 12.5% more.

Lutava: plants, kWh
kWpA yearJuneDecember
55,599710135
1011,1971,420270
1516,7962,130405

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 49,237 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.