Solar plant: site data

Solar power plant in Kyrylivka, Koriukivskyi Raion, Chernihiv Oblast

Kyrylivka: 1,095 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.2% below the oblast median (1,108). #89 of 220 in the rayon, #1107 of 1558 in the oblast.

Koryukivka, the rayon centre, is 12 km away. 131 m above sea level. 12 km away: Koryukivka, the nearest bigger centre, 1,085 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 61 km. 14.23 m between rows, pitch 18.00 m (latitude 51.7°).

Yield of 1 kWp
1,095kWh/year
Tilt
38°2° east of south
10 kW
10,945kWh/year
Row pitch
18.00m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kyrylivka

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 61 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan58Feb97Mar116Apr139May142Jun139Jul136Aug108Sep72Oct30Nov24Dec

June: 142 kWh/kWp, December: 24 — 5.9 times less.

November: 30 against 33 in the oblast, 9.1% less.

Kyrylivka: plants, kWh
kWpA yearJuneDecember
55,473710120
1010,9451,420240
1516,4182,130360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Koriukivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.