Solar plant: site data

Solar power plant in Kupyna, Prylutskyi Raion, Chernihiv Oblast

Kupyna: 1,114 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 0.6% above the oblast median (1,108). #243 of 285 in the rayon, #506 of 1558 in the oblast.

Pryluky, the rayon centre, is 34 km away. 158 m above sea level. 34 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Чернігів, 123 km. 13.21 m between rows, pitch 16.98 m (latitude 50.8°).

Yield of 1 kWp
1,114kWh/year
Tilt
38°2° east of south
10 kW
11,143kWh/year
Row pitch
16.98m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Kupyna

The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 123 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan57Feb95Mar116Apr140May142Jun144Jul140Aug110Sep78Oct35Nov23Dec

July: 144 kWh/kWp, December: 23 — 6.3 times less.

November: 35 against 33 in the oblast, 6.1% more.

Kupyna: plants, kWh
kWpA yearJulyDecember
55,572720115
1011,1431,440230
1516,7152,160345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.