Solar plant: site data

Solar power plant in Koshmaliv, Nizhynskyi Raion, Chernihiv Oblast

Koshmaliv: 1,102 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.5% below the oblast median (1,108). #297 of 327 in the rayon, #973 of 1558 in the oblast.

Nizhyn, the rayon centre, is 58 km away. 139 m above sea level. 36 km away: Konotop, the nearest bigger centre, 1,110 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 102 km. 13.64 m between rows, pitch 17.41 m (latitude 51.2°).

Yield of 1 kWp
1,102kWh/year
Tilt
38°1° east of south
10 kW
11,021kWh/year
Row pitch
17.41m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Koshmaliv

The designer opens with this place’s coordinates, latitude 51.2° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 102 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan55Feb92Mar117Apr140May143Jun143Jul139Aug109Sep75Oct33Nov22Dec

June: 143 kWh/kWp, December: 22 — 6.5 times less.

December: 22 against 24 in the oblast, 8.3% less.

Koshmaliv: plants, kWh
kWpA yearJuneDecember
55,511715110
1011,0211,430220
1516,5322,145330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.