Solar plant: site data

Solar power plant in Khutor Shursha, Nizhynskyi Raion, Chernihiv Oblast

Khutor Shursha: 1,118 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.9% above the oblast median (1,108). #88 of 327 in the rayon, #375 of 1558 in the oblast.

Nizhyn, the rayon centre, is 12 km away. 115 m above sea level. 12 km away: Nizhyn, the nearest bigger centre, 1,108 — 0.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 56 km. 13.47 m between rows, pitch 17.24 m (latitude 51.1°).

Yield of 1 kWp
1,118kWh/year
Tilt
38°1° east of south
10 kW
11,179kWh/year
Row pitch
17.24m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Khutor Shursha

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 56 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan54Feb96Mar119Apr140May145Jun145Jul139Aug112Sep77Oct34Nov24Dec

June: 145 kWh/kWp, December: 24 — 6.0 times less.

February: 54 against 57 in the oblast, 5.3% less.

Khutor Shursha: plants, kWh
kWpA yearJuneDecember
55,590725120
1011,1791,450240
1516,7692,175360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Nizhynskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.