Solar plant: site data

Solar power plant in Buianky, Chernihivskyi Raion, Chernihiv Oblast

Buianky: 1,102 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% below the oblast median (1,108). #294 of 479 in the rayon, #989 of 1558 in the oblast.

Chernihiv, the rayon centre, is 32 km away. 134 m above sea level. 32 km away: Chernihiv, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Чернігів, 34 km. 14.33 m between rows, pitch 18.10 m (latitude 51.8°).

Yield of 1 kWp
1,102kWh/year
Tilt
38°1° east of south
10 kW
11,017kWh/year
Row pitch
18.10m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Buianky

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 34 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan55Feb99Mar120Apr139May143Jun141Jul136Aug110Sep74Oct30Nov22Dec

June: 143 kWh/kWp, December: 22 — 6.5 times less.

November: 30 against 33 in the oblast, 9.1% less.

Buianky: plants, kWh
kWpA yearJuneDecember
55,509715110
1011,0171,430220
1516,5262,145330

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chernihivskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.