Solar plant: site data

Solar power plant in Bobryk Druhyi, Novhorod-Siverskyi Raion, Chernihiv Oblast

Bobryk Druhyi: 1,096 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.1% below the oblast median (1,108). #57 of 247 in the rayon, #1077 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 40 km away. 177 m above sea level. 35 km away: Koryukivka, the nearest bigger centre, 1,085 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 108 km. 14.84 m between rows, pitch 18.56 m (latitude 51.9°).

Yield of 1 kWp
1,096kWh/year
Tilt
39°2° east of south
10 kW
10,962kWh/year
Row pitch
18.56m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Bobryk Druhyi

The designer opens with this place’s coordinates, latitude 51.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 108 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan60Feb99Mar115Apr138May140Jun138Jul135Aug107Sep72Oct31Nov25Dec

June: 140 kWh/kWp, December: 25 — 5.6 times less.

January: 38 against 35 in the oblast, 8.6% more.

Bobryk Druhyi: plants, kWh
kWpA yearJuneDecember
55,481700125
1010,9621,400250
1516,4432,100375

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.