Solar plant: site data

Solar power plant in Berizka, Prylutskyi Raion, Chernihiv Oblast

Berizka: 1,115 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% above the oblast median (1,108). #236 of 285 in the rayon, #477 of 1558 in the oblast.

Pryluky, the rayon centre, is 36 km away. 153 m above sea level. 36 km away: Pryluky, the nearest bigger centre, the same 1,116. Snow and wind from the nearest regional centre in the DBN — Черкаси, 128 km. 12.55 m between rows, pitch 16.37 m (latitude 50.5°).

Yield of 1 kWp
1,115kWh/year
Tilt
37°2° east of south
10 kW
11,150kWh/year
Row pitch
16.37m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Berizka

The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 128 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb89Mar117Apr139May142Jun145Jul142Aug111Sep80Oct36Nov23Dec

July: 145 kWh/kWp, December: 23 — 6.3 times less.

November: 36 against 33 in the oblast, 9.1% more.

Berizka: plants, kWh
kWpA yearJulyDecember
55,575725115
1011,1501,450230
1516,7252,175345

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.