Section of the table from the Solispec engine (median zone — Cherkasy)

Suntech

Ground frame for 24 Suntech STP590S-C72/Nsh panels (2×12)

2 rows of 12 panels, 14.16 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
14.16kW
Steel
479.0kg
Posts
18
Bolts
184
Materials
61,688₴
Yield
16,125kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Suntech STP590S-C72/Nsh panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 80×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames8 frames, pitch up to 1,910 mm9 frames, pitch up to 1,680 mm8 frames, pitch up to 1,910 mm
Posts161816
Footings (bored concrete)16 pcs, Ø400 mm, depth 1,100 mm18 pcs, Ø300 mm, depth 1,100 mm16 pcs, Ø300 mm, depth 1,300 mm
Concrete2.43 m³1.54 m³1.62 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,211 mm600 / 2,211 mm600 / 2,202 mm
Panel field size13,968 × 2,970 mm13,968 × 2,970 mm13,968 × 2,975 mm
Row spacing between tables (no shade on 21 December)10,270 mm at noon · 11,540 mm ±2 h11,380 mm at noon · 13,140 mm ±2 h12,470 mm at noon · 14,820 mm ±2 h
Steel446.4 kg479.0 kg454.2 kg
BoltsM10 — 122, M8 — 52M10 — 132, M8 — 52M10 — 122, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials61,621 UAH61,688 UAH62,998 UAH
With installation and delivery98,081 UAH98,028 UAH99,458 UAH
Per 1 kW6,927 UAH/kW6,923 UAH/kW7,024 UAH/kW
Yield1,266 kWh/kW · 17,933 kWh/year1,139 kWh/kW · 16,125 kWh/year1,043 kWh/kW · 14,771 kWh/year
Strength σ/fy57%60%84%
Deflection / (L/200)43%40%63%
Rafter strength82%98%81%
Post utilisation16%19%23%
Utilisation89%97%91%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 82%.Cherkasy: Rafter C-channel 60×40×2: span between posts 2 178, cantilever 789 mm → strength 98%.Chernihiv: Rafter C-channel 80×40×2: span between posts 2 178, cantilever 789 mm → strength 81%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.9 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 9.2 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 97%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.2 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 91%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 910 mm, 8 frames. Purlin C-channel 60×40×2: strength 84%, deflection 63% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2469
П2Rear postTube 60×60×23,3369
Кр1Rafter (inclined beam)C-channel 60×40×23,7569
Пк1Frame strutC-channel 60×40×21,7519
Х1Longitudinal brace (cross)C-channel 60×40×22,3094
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——36
—Bolt M10×90 set · strut to post — through spacer inserts——9
—Bolt M10×130 set · post–rafter — through spacer inserts——36
—Bolt M10×140 set · strut to rafter — through spacer inserts——9
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 18 posts, Ø300×1100——1.54 m³

Profile cutting

30 bars of 6,000 mm, 164.9 m of profile in total.

  • Tube 60×60×29 bars
  • C-channel 60×40×221 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
61,688₴
With installation and delivery
98,028₴
Per 1 kW
6,923UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 16,125 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×12 layout with other panels

Next