Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 24 Jinko Tiger Neo JKM440N-54HL4R-BDV panels (2×12)

2 rows of 12 panels, 10.56 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
10.56kW
Steel
379.3kg
Posts
14
Bolts
164
Materials
50,627₴
Yield
12,026kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM440N-54HL4R-BDV panel and the 2 × 12 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,640 mm7 frames, pitch up to 2,220 mm7 frames, pitch up to 2,220 mm
Posts121414
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,838 mm600 / 1,838 mm600 / 1,838 mm
Panel field size13,968 × 2,324 mm13,968 × 2,324 mm13,968 × 2,324 mm
Row spacing between tables (no shade on 21 December)7,950 mm at noon · 8,940 mm ±2 h8,810 mm at noon · 10,180 mm ±2 h9,660 mm at noon · 11,480 mm ±2 h
Steel353.6 kg379.3 kg389.4 kg
BoltsM10 — 102, M8 — 52M10 — 112, M8 — 52M10 — 112, M8 — 52
Panel clampsend 8, middle 44end 8, middle 44end 8, middle 44
Materials49,586 UAH50,627 UAH51,771 UAH
With installation and delivery77,146 UAH78,137 UAH79,281 UAH
Per 1 kW7,305 UAH/kW7,399 UAH/kW7,508 UAH/kW
Yield1,266 kWh/kW · 13,374 kWh/year1,139 kWh/kW · 12,026 kWh/year1,043 kWh/kW · 11,015 kWh/year
Strength σ/fy82%80%86%
Deflection / (L/200)85%70%75%
Rafter strength68%79%85%
Post utilisation14%16%17%
Utilisation90%93%77%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 640 mm, 6 frames. Purlin C-channel 60×40×2: strength 82%, deflection 85% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 80%, deflection 70% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 220 mm, 7 frames. Purlin C-channel 60×40×2: strength 86%, deflection 75% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.0 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 90%.Cherkasy: Foundation Ø300 × 1 100: 0.078 m³ of concrete per post. Wind uplift on the front post ≈ 8.8 kN (with γ=1.5) vs ≈ 9.5 kN (concrete weight + soil friction, estimate) → 93%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Chernihiv: Rafter C-channel 60×40×2: span between posts 1 719, cantilever 622 mm → strength 85%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,1037
П2Rear postTube 60×60×22,9637
Кр1Rafter (inclined beam)C-channel 60×40×22,9647
Пк1Frame strutC-channel 60×40×21,4277
Х1Longitudinal brace (cross)C-channel 60×40×22,5454
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×21,9682
Р6Purlin (rail)C-channel 60×40×21,9682
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——28
—Bolt M10×90 set · strut to post — through spacer inserts——7
—Bolt M10×130 set · post–rafter — through spacer inserts——28
—Bolt M10×140 set · strut to rafter — through spacer inserts——7
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——44
—Bolt M8×50 + channel nut——52
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

24 bars of 6,000 mm, 132.3 m of profile in total.

  • Tube 60×60×27 bars
  • C-channel 60×40×217 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
50,627₴
With installation and delivery
78,137₴
Per 1 kW
7,399UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 12,026 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×12 layout with other panels

Next