Ground plant · Dnipro
A 50 kW ground-mounted solar plant in Dnipro: structure, materials, cost
84 Ulica UL-620M-132DDGN (dual glass bifacial) panels (52.08 kW) on 3 tables of 2 × 14. Snow and wind per the DBN for Dnipro: S₀ 1,340 Pa, W₀ 470 Pa.
- Power
- 52.08kW
- Steel
- 1,530.8kg
- Posts
- 54
- Bolts
- 576
- Materials
- 226,413₴
- Yield
- 61,443kWh/year
Ground frame designer
Design the 50 kW plant in the builder
Opens the 2 × 14 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Dnipro.
- No sign-up
- Snow and wind check
- Drawings and estimate
Panel
Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.
One table's structure (tables: 3)
| Layout | 3 tables, each 2 × 14 = 28 panels |
|---|---|
| Loads (DBN V.1.2-2:2006) | snow S₀ 1,340 Pa, wind W₀ 470 Pa, frost depth 1.0 m |
| Posts | Tube 60×60×2 |
| Rafters | C-channel 80×40×2 |
| Purlins and braces | C-channel 60×40×2 |
| Frames | 9 frames, pitch up to 1,960 mm |
| Posts | 18 |
| Footings (bored concrete) | 18 pcs, Ø400 mm, depth 1,100 mm |
| Concrete | 2.74 m³ |
| Tilt | 30° |
| Panel bottom / post top | 600 / 2,278 mm |
| Panel field size | 16,276 × 3,107 mm |
| Row spacing between tables (no shade on 21 December) | 11,480 mm at noon · 13,130 mm ±2 h |
| Steel | 510.3 kg |
| Bolts | M10 — 132, M8 — 60 |
| Panel clamps | end 8, middle 52 |
| Materials | 75,471 UAH |
| With installation and delivery | 119,811 UAH |
| Per 1 kW | 6,902 UAH/kW |
| Yield | 1,180 kWh/kW · 20,481 kWh/year |
Checks and cautions
| Check | Value | Status |
|---|---|---|
| Strength σ/fy | 83% | with a caution |
| Deflection / (L/200) | 64% | passes |
| Rafter strength | 82% | with a caution |
| Post utilisation | 23% | passes |
| Utilisation | 95% | with a caution |
| Depth vs frost depth | ok | passes |
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Frame spacing 1 960 mm, 9 frames. Purlin C-channel 60×40×2: strength 83%, deflection 64% of L/200 (snow on panel 861 Pa).
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 80×40×2: span between posts 2 276, cantilever 824 mm → strength 82%.
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.7 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 95%.
Bill of materials
The bill of materials and the estimate are per table; tables: 3.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,265 | 9 |
| П2 | Rear post | Tube 60×60×2 | 3,403 | 9 |
| Кр1 | Rafter (inclined beam) | C-channel 80×40×2 | 3,924 | 9 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,811 | 9 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,567 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 4,276 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 4,276 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 34 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 9 |
| — | Bolt M10×100 set · purlin to rafter | — | — | 36 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 36 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 9 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 52 |
| — | Bolt M8×50 + channel nut | — | — | 60 |
| — | Concrete for 18 posts, Ø400×1100 | — | — | 2.74 m³ |
Profile cutting
35 bars of 6,000 mm, 178.0 m of profile in total.
- Tube 60×60×29 bars
- C-channel 80×40×29 bars
- C-channel 60×40×217 bars
Estimated cost
The bill of materials and the estimate are per table; tables: 3.
- Materials per table
- 75,471₴
- With installation and delivery
- 119,811₴
- Per 1 kW
- 6,902UAH/kW
The engine's estimate has 24 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Materials for all tables (3): 226,413 UAH.
Yield
Yield: 1,180 kWh per 1 kW a year, ≈ 61,443 kWh a year in total for Dnipro (tilt 30°, the optimum for the latitude is 34.9°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.