10 kWp ground mount in Poltava: the calculation

A 10 kWp ground-mount structure in Poltava step by step: snow and wind, profile, concrete block weight under each support, row spacing. Every figure from the Solispec engine.

Autor Solispec editorial4 min czytania

Ten tekst nie jest jeszcze przetłumaczony na Twój język — pokazujemy oryginał.

A 10 kWp ground plant in Poltava is 16 panels on four rows of frame, four panels each. Below is the whole calculation in order: loads, profile, supports on concrete blocks, row spacing. Every figure comes from the same engine functions that stand behind the ground truss calculator, so you can repeat the calculation with your own data.

Inputs

  • Panel: Tongwei TWMNH-66HD, 640 W, 2382 x 1134 mm. 16 panels make 10.24 kWp.
  • Layout: 4 rows of 4 panels in portrait, tilt 34 degrees.
  • Site: Poltava, the DBN V.1.2-2:2006 region with S0 = 1450 Pa and W0 = 470 Pa.
  • Profile: perforated C 41 x 41 x 2.5 mm. Supports: cast concrete cubes of 400 mm, 150 kg each.

Loads

Snow and wind follow DBN V.1.2-2:2006 for the Poltava region. Wind acts on the tilted panels with a coefficient from EN 1991-1-4, and its resultant sits off the centre of the panel. That coefficient is defined on the peak pressure, so the wind on it is Wm = γfm · W0 · c_e(z) · Calt with the EN exposure factor c_e(z) in place of the DBN height factor Ch, and W0 taken as the basic pressure q_b. Both combinations are checked: snow leading and wind leading. How this is organised is described in the article on how a ground-mount truss is checked.

Truss and profile

A row of 4 panels sits on 6 trusses 860 mm apart. The most loaded member is the rafter K1, used to 86 %. With a 2 mm wall it would take 101 % and fail, which is why the example uses 2.5 mm. The rail, strut, base, rear post and node are loaded less. One row takes about 160 kg of steel, four rows 639 kg.

The calculator also notes the top overhang of the panel beyond the end of the truss: an item for the designer, not a profile error.

Supports: how much a block must weigh

Each truss stands on two supports, so a row has 12. For each support the engine computes two figures:

  • against uplift, 264 kg;
  • against sliding by friction on the ground (0.35), 344 kg.

The larger one governs, 344 kg. A cast cube of 400 mm weighs 150 kg, so each support needs three cubes stacked (450 kg). For the 48 supports of the plant that is 144 cubes and about 21600 kg of concrete. Screw piles in place of blocks also pass the check; their capacity is confirmed by a trial screw-in on site. Block weights for other regions and tilts are in the table on the calculator page.

Row spacing

By the method of the tilt and row spacing calculator for the latitude of Poltava, the row pitch is 7.4 m, the clear gap between rows 5.4 m and the ground coverage ratio 0.32. The horizontal depth of one row is 1.97 m. A shorter pitch shades the rows in winter, a longer one enlarges the plot. Work out your own variant in the tilt and spacing calculator.

In short

  • 16 panels of 640 W, 10.24 kWp, 4 rows of 4 panels.
  • Poltava: S0 = 1450 Pa, W0 = 470 Pa.
  • Profile C 41 x 41 x 2.5 mm, truss spacing 860 mm, highest utilisation the rafter, 86 %.
  • Support: 344 kg, three 400 mm cubes per support, 144 cubes for the plant's 48 supports.
  • Row pitch 7.4 m.

Other types of structure and a comparison of piles and blocks are on the ground mounting page. For another city change the region in the snow and wind calculator, and the full set of drawings and specifications comes from the designer.

The calculation is preliminary. A qualified engineer must check it before installation.

FAQ

How much concrete does a 10 kWp ground plant in Poltava need?

For the example above, 144 cubes of 150 kg, about 21600 kg of concrete: three for each of the 48 supports in four rows. The weight depends on tilt and region, so recalculate for your own site in the calculator.

Piles or blocks?

Both pass the check in the example. Piles need no weight, but their capacity is confirmed on site. Blocks need the weight that the support calculation gives, here three cubes per support, so piles save a lot of concrete.

What row spacing should I use in Poltava?

By the calculator method, 7.4 m for a 34 degree tilt. The method and formulas are on the tilt and row spacing calculator page.

KonstrukcjeNormy

Nowości i porady projektowe

Co nowego w Solispec, zmiany norm i praktyczne porady dotyczące projektowania instalacji fotowoltaicznych.

Co Cię interesuje

Jak przetwarzamy dane: polityka prywatności.

Projektant konstrukcji gruntowych

Zaprojektuj konstrukcję gruntową dla swojej instalacji PV

Solispec dobierze profile i słupy, sprawdzi konstrukcję pod kątem śniegu i wiatru i wyceni ją co do śrubki.

  • Bez rejestracji
  • Sprawdzenie śniegu i wiatru
  • Rysunki i kosztorys