Ground-mount frame in Madrid: a 10 kWp worked example
A 10 kWp ground-mount structure in Madrid, Spain, step by step: snow and wind, profile, concrete block weight under each support, row spacing. Every figure from the Solispec engine.
Dieser Text ist noch nicht übersetzt — das Original wird angezeigt.
A 10.24 kWp ground plant in Madrid, with 16 panels in four rows of four at 34 degrees, works with a perforated C profile of 41 x 41 x 3 mm whose most loaded member is used to 96 %. Each support needs 489 kg, which is four concrete cubes of 150 kg. Inputs and results are below.
Every figure comes from the same engine functions that stand behind the ground truss calculator, so you can repeat the calculation with your own data.
Inputs and results
| Item | Value |
|---|---|
| Site | Madrid, 665 m above sea level |
| Snow | zone 4, s_k = 600 Pa (national-annex / CTE DB SE-AE value used in the calculator) |
| Wind | zone A, q_b = 420 Pa |
| Panels | Tongwei TWMNH-66HD, 640 W, 2382 x 1134 mm |
| Layout | 4 rows of 4 panels in portrait, 16 panels, 10.24 kWp, tilt 34 degrees |
| Profile | perforated C 41 x 41 x 3 mm |
| Trusses | 6 per row, spacing 860 mm |
| Most loaded member | rafter K1, 96 % utilisation |
| Steel | 189 kg per row, 757 kg in total |
| Support, uplift | 382 kg |
| Support, sliding (friction 0.35) | 489 kg |
| Concrete cubes of 400 mm (150 kg) | 4 per support, 12 supports per row, 48 supports |
| Concrete in total | 192 cubes, 28800 kg |
| Row spacing | 5.12 m pitch, clear gap 3.1 m, ground coverage ratio 0.47 |
Loads
Snow and wind are taken as actions with the national-annex and CTE DB SE-AE values for Madrid: s_k = 600 Pa and q_b = 420 Pa, with a partial factor of 1.5 for variable actions. Wind acts on the tilted panels with the pressure coefficient of EN 1991-1-4, and its resultant sits off the centre. Both combinations are checked: snow leading and wind leading. How this is organised is described in the article on how a ground-mount truss is checked.
Truss and profile
A row of 4 panels sits on 6 trusses 860 mm apart. The most loaded member is the rafter K1, at 96 %: it passes, with little margin. With a 2 mm wall the same rafter exceeds 100 % and fails, so the example uses 3 mm. The rail, strut, base, rear post and node are loaded less. One row takes about 189 kg of steel, four rows 757 kg.
The calculator also notes the top overhang of the panel beyond the end of the truss: an item for the designer, not a profile error.
Supports: how much a block must weigh
Each truss stands on two supports, so a row has 12. For each support the engine computes two figures:
- against uplift, 382 kg;
- against sliding by friction on the ground (0.35), 489 kg.
The larger one governs, 489 kg. A cast cube of 400 mm weighs 150 kg: three cubes (450 kg) are not enough, four (600 kg) are. For the whole plant that is 192 cubes and about 28800 kg of concrete. Screw piles in place of blocks also pass the check; their capacity is confirmed by a trial screw-in on site.
Row spacing
By the method of the tilt and row spacing calculator for the latitude of Madrid, the row pitch is 5.12 m, the clear gap between rows 3.1 m and the ground coverage ratio 0.47. The horizontal depth of one row is 1.97 m. A shorter pitch shades the rows in winter, a longer one enlarges the plot. Work out your own variant in the tilt and spacing calculator.
Bill of materials in short
- 16 panels of 640 W, 4 rows of 4;
- 24 trusses (6 per row), perforated C 41 x 41 x 3 mm, 757 kg of steel;
- 48 supports with 4 concrete cubes of 400 mm each, 192 cubes in total.
The designer produces the full list with drawings and cut lists, and the samples page shows an example report. Other types of structure and a comparison of piles and blocks are on the ground mounting page. For another city change the values in the snow and wind calculator.
The calculation is preliminary. A qualified engineer must check it before installation.
FAQ
How much concrete does a 10 kWp ground plant in Madrid need?
For the example above, 192 cubes of 150 kg, about 28800 kg: four for each of the 48 supports. The weight depends on tilt and wind zone, so recalculate for your own site in the calculator.
Piles or concrete blocks?
Both pass the check in the example. Piles need no weight, but their capacity is confirmed on site. Blocks need the weight that the support calculation gives.
What row spacing should I use in Madrid?
By the calculator method, 5.12 m for a 34 degree tilt. The method and formulas are on the tilt and row spacing calculator page.
Is this a Eurocode calculation?
We do not call it that. Snow and wind are actions with national-annex and CTE DB SE-AE values, and the checks are preliminary. The final calculation is done by an engineer.